Completed Projects
DCC were employed to carry out thermal modelling on this project and take into account an existing chilled water system. We then had to zone the building and add a VRV system to pick up
With no floor or roof space for plant we had to think outside the box on this project. A condensing unit fitted between the floors within the void was incorporated here to provide heating and cooling to the space
1 Cornhill, City of London
22 Sackville Street, Mayfair
DCC's first project.
Situated in the heart of Mayfair, this 245m² 4th floor commercial office had a Cat A refurbishment in 2016 with new LED lighting and VRV system. We were employed to develop design with our client including ductwork
Ranger House, Guildford
Capital House, City of London
Covering Basement, Ground and 8th Floor.
Working for a Mechanical Contractor we developed the consultant Stage 3 design to a detailed level. Scope was wide on this one with a replacement of building AHU and smoke
PureGym, Sidcup
Projects of this type are usually blank canvas warehouses with large ducts and low comfort requirements. With the existing building on this one being an old derelict leisure centre it demanded some more thought into getting mechanical and public health
UAL Eagle Wharf
Client brief was to carry out an extensive thermal model using IES VE covering 190 zones to ensure accurate heating and cooling in each space taking solar shading into account from surrounding buildings.