Completed Projects

DCC were employed to carry out thermal modelling on this project and take into account an existing chilled water system. We then had to zone the building and add a VRV system to pick up

With no floor or roof space for plant we had to think outside the box on this project. A condensing unit fitted between the floors within the void was incorporated here to provide heating and cooling to the space

1 Cornhill, City of London

22 Sackville Street, Mayfair

DCC's first project. 

Situated in the heart of Mayfair, this 245m² 4th floor commercial office had a Cat A refurbishment in 2016 with new LED lighting and VRV system. We were employed to develop design with our client including ductwork

Ranger House, Guildford

Capital House, City of London

Covering Basement, Ground and 8th Floor.

Working for a Mechanical Contractor we developed the consultant Stage 3 design to a detailed level. Scope was wide on this one with a replacement of building AHU and smoke

PureGym, Sidcup

Projects of this type are usually blank canvas warehouses with large ducts and low comfort requirements. With the existing building on this one being an old derelict leisure centre it demanded some more thought into getting mechanical and public health 

UAL Eagle Wharf

Client brief was to carry out an extensive thermal model using IES VE covering 190 zones to ensure accurate heating and cooling in each space taking solar shading into account from surrounding buildings.